At the beginning of each planning of energy centers and distributions stands the careful analysis of the consumers to be supplied. A sustainable optimization requires a metrological recording of hourly energy consumption values in existing buildings and an assessment of potentials for energy saving in the building or process equipment. In modern greenfield projects, advanced simulation tools allow for sufficiently accurate predictions of the hourly demand values for, e.g., electricity, heat, cooling, cooling water, steam and compressed air. The FC-Gruppe has acquired over 25 years of expertise with numerous references in holistic energetic evaluations.

TU Hamburg

Projekt - Energie - TU Hamburg Harburg - FC-Gruppe

Renovation of a refrigeration machine and refurbishment of cooling towers
Builder: Freie und Hansestadt Hamburg
Cost of production: € 0.83 million
Realization: 2014-2015
Division: Planen (KGR 430, 480)

Universitätsklinikum Essen

Projekt - Energie - Universitaetsklinikum Essen - FC-Gruppe

Fundamental Refurbishment of the Energy Center of the University Hospital Essen
Builder: Bau- und Liegenschaftsbetrieb NRW
Project costs: € 7.74 million
Realization: 2002-2009 
Division: Planen (KGR 410-430)

Blockheizkraftwerk Lübeck

Projekt - Energie - Stadtwerke Luebeck - Blockheizkraftwerk - FC-Gruppe

Construction of the cogeneration plant Ratekauer Weg in Lübeck
Builder: Stadtwerke Lübeck GmbH 
Technical costs: € 1.63 million 
Realization: 2013-2014
Division: Planen (KGR 400)

Klinikum Karlsruhe

Projekt - Energie - Klinikum Karlsruhe Haus G - FC-Gruppe

Construction of a CHP, steam, heat and cold supply
Builder: Städtisches Klinikum Karlsruhe
Project costs: € 36 million
Realization: 2010-2017
Division: Steuern

GFM-Rommel-Kaserne

Projekt - Energie - GFM Rommel Kaserne - FC-Gruppe

Refurbishment of energy and district heating center  Augustdorf
Builder: BLB Bielefeld
Project costs: € 4.53 million
Realization: 2010-2012
Division: Planen (KGR 420)

AUDI AG Ingolstadt

Projekt - Energie - AUDI AG Ingolstadt - FC-Gruppe

New construction of energy center / gas turbines
Builder: Audi AG Ingolstadt
Project costs: € 15 million
Realization: 1997-1998 
Division: Planen (KGR 400)

Stadtwerke Lübeck GmbH

Projekt - Energie - Stadtwerke Luebeck - FC-Gruppe

Refurbishment of heating center Ziegelstraße 
Builder: Stadtwerke Lübeck GmbH
Project costs: € 2.35 million
Realization: 2013-2015
Division: Planen (KGR 400)

Luftwaffenkaserne Köln

Projekt - Energie - Luftwaffenkaserne Koeln Wahn - FC-Gruppe

Refurbishment of heat supply 
Builder: BLB Köln
WV network: approx. 6,800 Trm
Project costs: € 14.5 million 
Realization: 2014-2016
Division: Planen (KGR 420, 480)

Josefsheim Bigge

Projekt - Energie - Energiestudie Josefsheim Bigge - FC-Gruppe

Energy study Josefsheim Bigge - energy concept for the residential and training center 
Builder: Josefsheim Bigge Olsberg
Area: 50,000 m²
Heat load calculation of buildings, including assessment of the impact of structural restoration measures
Division: Planen (KGR 400)

Energiewerk Trittau

Projekt - Energie - Rheinmetall Waffe Munition GmbH - FC-Gruppe

Refurbishment of the heat supply for the plant in Trittau
Survey and elaboration of a real estate heat supply concept
Builder: Rheinmetall Waffe Munition GmbH, Trittau
Project costs: € 0.84 million
Realization: 2010-2012
Division: Planen (KGR 400)

Wilhelmsburgkaserne Ulm

Projekt - Energie - Wilhelmsburgkaserne Ulm - FC-Gruppe

Energy concept Wilhelmsburgkaserne Ulm
Staatliches Hochbauamt Ulm
Inventory of heat, cold, ventilation and electrotechnical systems
Elaboration of concepts for the future heat, cold and hot drinking water and electricity supply.
Realization: 2009
Division: Planen (KGR 400)

Bundesamt Seeschifffahrt

Projekt - Energie - Bundesamt Seeschifffahrt - FC-Gruppe

Bundesamt für Seeschifffahrt und Hydrologie
Creation of an energy requirement certificate based on DIN V 18599
Builder: Bundesbauabteilung Hamburg
Total land area: 15,000 m²
Plant technology: 3 boilers, 9 ventilation systems, circulating air cooling units
Realization: 2008
Division: Planen (KGR 400)